Candlewood Suites Fort Liberty

Fort Liberty, NC

The image shows a drawing of a large, multi-story building with beige and brown accents, a parking lot, and two people in military uniforms walking toward it.
The image shows a large multi-story Mass Timber building under construction, with multiple square window openings. Yellow barriers surround the site, and a crane is visible on the right. The sky is overcast with scattered clouds.
Interior view of a building under construction with CLT ceilings supported by steel beams, showing a hybrid wood and steel structure.
The image shows two tall wooden walls with a large wooden panel being lifted into place between them, set against a clear blue sky. The panel appears to be part of a construction project using cross-laminated timber (CLT).
The image shows two workers at a construction site where a crane is lifting a large wooden panel in front of a multi-story wooden building with window openings.
Image
Image

    The Candlewood Suites project at Fort Liberty is Sterling Structural’s largest mass timber project to date. This seven-story lodging facility provides accommodations for visitors to the base and showcases the strength, versatility, and efficiency of Cross-Laminated Timber (CLT) construction. 

    Sterling Structural supplied the full CLT package, including walls, floors, roof, and shaft wall assemblies—totaling approximately 3,500 panels across the 21,150-square-foot floor plates. CLT was selected not only for its speed of construction but also for its blast-resistant properties, critical for military-adjacent facilities. Special detailing and connection designs were developed to meet these rigorous requirements. 

    Beyond material supply, Sterling provided design-assist services during the construction documentation phase, helping the project team optimize mass timber use, meet performance criteria, and maintain an aggressive schedule. Sterling also procured the structural steel, hold-down rod system, glulam components, hardware, and fasteners, delivering a comprehensive structural package to support a seamless build process. 

    This landmark project highlights the potential of mass timber for large-scale, high-performance structures, combining resilience, speed, and sustainability in one of the most demanding building environments. 

    Project Stats

    YEAR BUILT:

    2024

    NUMBER OF STORIES:

    6

    CONSTRUCTION TYPE:

    IV-C

    SQ FT:

    123,000

    Project Details

    BUILDING TYPE:

    Hotel/Motel

    MATERIAL TYPES:

    Mass Timber
    Cross-Laminated Timber (CLT)
    Glue-Laminated Timber (GLT or glulam)

    PROJECT TEAM:

    Contractor – Centenial Public Partnerships (FKA LendLease USA)

    Mass Timber installation, structural steel procurement and erection – MLP Solutions

    Connectors , fasteners – Simpson Strong-Tie 

    Tools  – Rothoblaas

    Architect – LK Architecture

    Engineer – SCA Consulting Engineers